We have relocated our offices to: Unit 207, Clerkenwell Workshops, 27/31 Clerkenwell Close, Farringdon EC1R 0AT
Modernisation

Case Study - Dolphin Square Equipment Update Programme

Modernisation

Background

A prestigious residential building

Dolphin Square is a prestigious residential building in the heart of London consisting of 13 mid-rise blocks around a central square with retail and conference facilities. Each block has its own lift service arranged as a duplex , consisting of original Otis equipment, installed circa 1970. As part of the service provision MKM were asked to provide proposals and a programme to update the lift equipment across the estate.

Challenge

Minimum disruption

Each block consists of a pair of passenger lifts serving the residential floors, the challenge was to replace the aging lift equipment with new state of the art equipment with the minimum of disruption to both the lift service and the living environment of the residents.

Solution

Exceptional reliability

As part of the close relationship forged through the service provision, we were familiar with the equipment and the demanding customer requirements. Through close co-operation with both supplier and end user we were able to present a phased programmed plan to upgrade the equipment.

The new equipment fully integrates with the retained 1970’s components, while still providing state-of-the-art lifts providing exceptional reliability with open protocol UK sourced equipment. The modernisation programme is on-going, to date nine lifts have been fully modernised.

Related Case Studies

Tower Place Modernisation

Tower Place is a landmark building in Central London, designed by Foster and Partners. It is a striking building situated next to the world-famous Tower of London, it consists of two blocks over seven levels, incorporating significant architectural features and is highly energy-efficient building.

Read more

Helicon Full Modernisation

Helicon was constructed in the mid-1990’s as a part of the regeneration of the Moorgate area. It is a Landmark building comprising nine floors above ground and two below. The equipment consists of original Schindler passenger, goods and vehicle lifts. MKM were awarded the tender for a full modernisation of the six-car group, scenic passenger lifts.

Read more

Millbank Tower Maintenance Services

Millbank Tower is a landmark building beside the River Thames, it comprises the 32-floor high rise tower and the low-rise building. MKM were asked to provide maintenance services to ensure essential passenger transport to the fully occupied building.

Read more

Millbank Tower Lift Equipment Modernisation

Millbank Tower is a landmark building beside the River Thames, it comprises the 32-floor high rise tower and the low-rise building. The equipment consists of original Otis equipment which was installed circa 1970. MKM were asked to update selected crucial lift equipment.

Read more

Dolphin Square Estate Maintenance Services

Dolphin Square is a prestigious residential building in the heart of London. MKM were asked to provide maintenance services for the entire, fully occupied, residential estate and took over from the original equipment manufacturer following a detailed and extensive tender process.

Read more

“After many years we’re vacating our current building and moving to new offices. We’re all super sad to lose MKM as our maintenance providers, the work you and the team have done is outstanding.”

Facilities Operations Manager, Anglo American

“I just wanted to take the opportunity to thank you all for everything this year. You have all been absolutely amazing and I really cannot thank you all enough for your efforts.”

Building Manager, The Helicon

“Want to say a massive thank you for completing these lifts a week early. To hear two different insurance inspectors praise the installation is very impressive. Your team have been brilliant throughout and have ensured the project ran seamlessly. “

Project Manager, Global Workplace Solutions