Modernisation

Case Study - Tower Place Modernisation

Modernisation

Background

Landmark building

Tower Place is a Landmark building providing seven floors above ground. Construction was completed in 2002 as part of the renewal of the area around the Tower of London, providing high quality office space as well as an open publicly accessible plaza. The original equipment consisted of original Otis lifts. MKM were awarded the project following a tender for a full modernisation of the four and five-car group passenger lifts, six fireman’s lifts and two goods lifts.

Challenge

Full modernisation

Our challenge was to carry out a full modernisation to all lifts while a full internal office space refurbishment was being carried out by other contractors. We replaced the equipment to a tight programme to meet the demands for the building to be re-occupied from multiple sites.

Solution

Exceptional reliability

A good relationship with building management had already been forged through the service provision prior to the project works. We involved equipment manufacturers at tender stage so the mobilisation upon award was quick and easy. Progress meetings with the client, project managers, both lift consultancies and main contractor began shortly after award and well before site works starting. This allowed advanced planning and discussion which in turn allowed works on site to begin and progress as smoothly as possible while integrating with the other contractors.

The customer is now benefiting from state-of-the-art lift equipment providing exceptional reliability with open protocol UK sourced equipment.

Related Case Studies

Helicon Full Modernisation

Helicon was constructed in the mid-1990’s as a part of the regeneration of the Moorgate area. It is a Landmark building comprising nine floors above ground and two below. The equipment consists of original Schindler passenger, goods and vehicle lifts. MKM were awarded the tender for a full modernisation of the six-car group, scenic passenger lifts.

Read more

Millbank Tower Maintenance Services

Millbank Tower is a landmark building beside the River Thames, it comprises the 32-floor high rise tower and the low-rise building. MKM were asked to provide maintenance services to ensure essential passenger transport to the fully occupied building.

Read more

Millbank Tower Lift Equipment Modernisation

Millbank Tower is a landmark building beside the River Thames, it comprises the 32-floor high rise tower and the low-rise building. The equipment consists of original Otis equipment which was installed circa 1970. MKM were asked to update selected crucial lift equipment.

Read more

Dolphin Square Estate Maintenance Services

Dolphin Square is a prestigious residential building in the heart of London. MKM were asked to provide maintenance services for the entire, fully occupied, residential estate and took over from the original equipment manufacturer following a detailed and extensive tender process.

Read more

Dolphin Square Equipment Update Programme

Dolphin Square is a prestigious residential building in the heart of London consisting of 13 mid-rise blocks around a central square with retail and conference facilities. MKM were asked to provide proposals and a programme to update the lift equipment across the estate.

Read more

“After many years we’re vacating our current building and moving to new offices. We’re all super sad to lose MKM as our maintenance providers, the work you and the team have done is outstanding.”

Facilities Operations Manager, Anglo American

“I just wanted to take the opportunity to thank you all for everything this year. You have all been absolutely amazing and I really cannot thank you all enough for your efforts.”

Building Manager, The Helicon

“Want to say a massive thank you for completing these lifts a week early. To hear two different insurance inspectors praise the installation is very impressive. Your team have been brilliant throughout and have ensured the project ran seamlessly. “

Project Manager, Global Workplace Solutions