Case Study - Millbank Tower Maintenance Services

Maintenance

Background

A landmark building

Millbank Tower is a landmark building beside the River Thames, it comprises the 32-floor high rise tower and the low-rise buildings. The equipment consists of original Otis equipment which was installed circa 1970. MKM were asked to provide maintenance services to ensure essential passenger transport to the fully occupied building.

Challenge

Availability & reliability

Our challenge was to keep maximum availability and reliability of the ageing lift equipment, especially as many parts no longer freely available. The building is multi-tenanted, multi-use including office space, conference facilities and hospitality venues on the top floor. Continuity of lift service to the high-rise floors is essential. MKM took over following long periods with Original Equipment Manufacturers.

Solution

State-of-the-art lifts

Following thorough surveys and familiarisation with the equipment and customer requirements we instated a thorough maintenance programme adapted to each lift via semi- resident engineers. A full life cycle survey on parts was completed and the report is updated quarterly so the customer if fully aware of risks and exposure. We created an open and trusted partnership with management and consultants which is cemented by daily engineer updates and quarterly management reviews. Following our appointment breakdowns were reduced by 60% within the first six months, this exceptional service has continued. MKM were re-appointed following the initial three-year agreement.

Related Case Studies

Tower Place Modernisation

Tower Place is a landmark building in Central London, designed by Foster and Partners. It is a striking building situated next to the world-famous Tower of London, it consists of two blocks over seven levels, incorporating significant architectural features and is highly energy-efficient building.

Read more

Helicon Full Modernisation

Helicon was constructed in the mid-1990’s as a part of the regeneration of the Moorgate area. It is a Landmark building comprising nine floors above ground and two below. The equipment consists of original Schindler passenger, goods and vehicle lifts. MKM were awarded the tender for a full modernisation of the six-car group, scenic passenger lifts.

Read more

Millbank Tower Lift Equipment Modernisation

Millbank Tower is a landmark building beside the River Thames, it comprises the 32-floor high rise tower and the low-rise building. The equipment consists of original Otis equipment which was installed circa 1970. MKM were asked to update selected crucial lift equipment.

Read more

Dolphin Square Estate Maintenance Services

Dolphin Square is a prestigious residential building in the heart of London. MKM were asked to provide maintenance services for the entire, fully occupied, residential estate and took over from the original equipment manufacturer following a detailed and extensive tender process.

Read more

Dolphin Square Equipment Update Programme

Dolphin Square is a prestigious residential building in the heart of London consisting of 13 mid-rise blocks around a central square with retail and conference facilities. MKM were asked to provide proposals and a programme to update the lift equipment across the estate.

Read more

“After many years we’re vacating our current building and moving to new offices. We’re all super sad to lose MKM as our maintenance providers, the work you and the team have done is outstanding.”

Facilities Operations Manager, Anglo American

“I just wanted to take the opportunity to thank you all for everything this year. You have all been absolutely amazing and I really cannot thank you all enough for your efforts.”

Building Manager, The Helicon

“Want to say a massive thank you for completing these lifts a week early. To hear two different insurance inspectors praise the installation is very impressive. Your team have been brilliant throughout and have ensured the project ran seamlessly. “

Project Manager, Global Workplace Solutions